Traffic on the M25 (right hand)
and one over of cricket (left hand)
in 3 minutes:
Score formed by transposing 3-minutes of
London orbital motorway traffic plus runs
scored during one over of a cricket match.
8 lanes of M25 correspond to notes in Cmaj scale.